51Testing软件测试论坛

 找回密码
 (注-册)加入51Testing

QQ登录

只需一步,快速开始

微信登录,快人一步

查看: 6929|回复: 2
打印 上一主题 下一主题

[资源] 谁有英文版的测试报告模板啊?可以麻烦上传分享下吗,谢谢啊!

[复制链接]

该用户从未签到

跳转到指定楼层
1#
发表于 2010-8-10 11:41:47 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
如题!
分享到:  QQ好友和群QQ好友和群 QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
收藏收藏
回复

使用道具 举报

  • TA的每日心情
    郁闷
    2016-6-2 16:41
  • 签到天数: 1 天

    连续签到: 1 天

    [LV.1]测试小兵

    2#
    发表于 2010-8-10 13:18:54 | 只看该作者
    中文版的翻译一下不就ok了
    回复 支持 反对

    使用道具 举报

    该用户从未签到

    3#
    发表于 2010-8-10 14:56:32 | 只看该作者

    英文测试case

    SW: OS: WINDOWS VISTA TO WINDOWS 7 UPGRADE                       
    Test Case ID        498215.1               
    Test Case Name        SW: OS: Windows Vista to Windows 7 upgrade               
    Test Case Version        1               
    Test Case Objective        To verify that a Dell SUT can succesfully perform an upgrade from XP to VISTA               
    Test Case Equipment                       
    Test Case Software                       
    Test Setup        􀁺 Factory Install or Hand Install Vista on the target SUT.               
    Test Setup Time        0 min               
    Test Attended Time        2 hr               
    Test Unattended Time        1 hr 40 min               
    Test Total Time        3 hr 40 min               
    Test Notes/Comments        "􀁺 Any issues that can cause a detrimental customer experience must be flagged as such.
    􀁺 Issue Consideration:
    Issues will be anything that stops the upgrade, driver that breaks, applications that do not work.
    􀁺 Issue Severity:
    All usual BSOD and lockups + All functional issues with Dell upgrade are Sev 1
    􀁺 Upgrade Path:
    When upgrading your Vista to a Windows 7 SKU, the following should be expected(Granted you use the correct PID)
    - 32 bit:
    -- XP (Home) upgrades to Vista Home Basic
    -- XP (Media Center)upgrades to Vista Home Premium
    -- XP (Professional) upgrades to Vista Business Edition
    - 64 bit:
    -- XP (Professional 64) does not have an upgrade path to Vista Business Edition 64"               
    Test Revision History        Rev. 1, Dec 4 2008, Adnan Wasim (Client Validation - Test Case Library): Initial Rev.               
                           
                           
                           
    Test Procedures                       
    Procedure Step Number        Test Procedure        Expected Result        Result
            Functionality Verification and Data Collection (15 minutes)               
    1         "Break the seal on the unit, and check:
    􀁺 Device Manager for bangs.
    􀁺 Check the Event Viewer for any errors.
    􀁺 Update your Antivirus solution and reboot as needed."        "􀁺 No device manager issues (bangs, devices with X across)
    􀁺 Event Viewer should not have any problems\warnings
    *If any issues are found, correct them, and clear the event viewer before continuing*"        Pass
    回复 支持 反对

    使用道具 举报

    本版积分规则

    关闭

    站长推荐上一条 /1 下一条

    小黑屋|手机版|Archiver|51Testing软件测试网 ( 沪ICP备05003035号 关于我们

    GMT+8, 2024-5-10 08:05 , Processed in 0.069892 second(s), 27 queries .

    Powered by Discuz! X3.2

    © 2001-2024 Comsenz Inc.

    快速回复 返回顶部 返回列表