51Testing软件测试论坛

 找回密码
 (注-册)加入51Testing

QQ登录

只需一步,快速开始

微信登录,快人一步

手机号码,快捷登录

查看: 2219|回复: 0
打印 上一主题 下一主题

[求助] 教你如何跟踪缺陷生存状态

[复制链接]

该用户从未签到

跳转到指定楼层
1#
发表于 2008-4-28 10:59:13 | 只看该作者 回帖奖励 |正序浏览 |阅读模式
  1. Function Bug_CanPost
  2. 'Enter code to be executed before current bug is posted
  3. 'if you want to abort posting, use Bug_CanPost = False

  4. On Error Resume Next

  5. Dim detected_date
  6. Dim closing_date

  7. 'Determine if "Defect Status" is closed
  8. If fields.Field("BG_USER_05").Value = "Closed" Then
  9. ' Format dates
  10. ' detected_date = DateValue(fields.Field("BG_DETECTED_DATE").Value)
  11. ' closing_date = DateValue(fields.Field("BG_CLOSING_DATE").Value)

  12. detected_date = fields.Field("BG_DETECTED_DATE").Value
  13. closing_date = fields.Field("BG_CLOSING_DATE").Value

  14. ' Determine the number of week days between defect "Detected on Date" and "Closing Date"
  15. fields.Field("BG_USER_08").Value = DateDiff("h", detected_date, closing_date)
  16. End If

  17. End Function
复制代码
分享到:  QQ好友和群QQ好友和群 QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
收藏收藏
回复

使用道具 举报

本版积分规则

关闭

站长推荐上一条 /1 下一条

小黑屋|手机版|Archiver|51Testing软件测试网 ( 沪ICP备05003035号 关于我们

GMT+8, 2024-11-16 21:08 , Processed in 0.073034 second(s), 28 queries .

Powered by Discuz! X3.2

© 2001-2024 Comsenz Inc.

快速回复 返回顶部 返回列表