51Testing软件测试论坛

 找回密码
 (注-册)加入51Testing

QQ登录

只需一步,快速开始

微信登录,快人一步

手机号码,快捷登录

查看: 6245|回复: 0
打印 上一主题 下一主题

[原创] 有谁做过IKM的软件测试题目,在线等,急!!!!

[复制链接]

该用户从未签到

跳转到指定楼层
1#
发表于 2011-4-25 19:12:20 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
Question 12: Which of the following methods are used to develop User Acceptance Test criteria? (验收测试)
A. Speaking to the business analysts and the primary customer interfaces to find out how the customers will be using the system and what features are important to them.  
B. Talking to the development staff to determine which features have the most risk. Include these features in the User Acceptance Test criteria.  
C. Include in the acceptance criteria all requirements included in the software requirements document.  
D. If a software contract exists which includes User Acceptance Test criteria, only use these criteria in the User Acceptance Test test plan.  
E. The User Acceptance Test criteria MUST include criteria covering major functions, software interfaces, security concerns and performance goals.  
CE
Question 13: One testing strategy is to use real, live test data when running test cases on an application in testing.
Which of the following support reasons for using a test data generator and creating test data rather than using a live sample of data for testing? (测试数据)
A. Beta testing - A test data generator may be needed to provide users with live, actual data when completing their beta testing.  
B. New data sets and null values - A live data set may represent a mature or aged, complete set of data, but data may need to be cleared and partially regenerated to mimic a new or fresh set of data.  
C. Time and Date dependent tests - A complete set of time and date dependent data may not be available with a given set of live data on a give day, so a test data generator may be needed to simulate data from varying times and dates.  
D. Boundary tests(边界值) - When testing outside of valid ranges, a tester may need to create or seed outlier values in order to cover scenarios that may be missed with live data.  
E. Acceptance testing - A test data generator may be needed to create commercial, production data when testers complete any testing that requires as close to a user environment as possible.  
D
Question 14: Which of the following are software quality risks due to hard coding? (软件质量风险导致硬编译)
A. Code containing a lookup table of states based on postal code  
B. Code containing specific dates  
C. Code containing a pointer to the first record in a database  
D. Code containing a user's username and password text string  
E. Code containing a list of file locations  
AC
Question 15: Reported software defects often require further software repairs after the defect(缺陷) is reported and initially marked fixed(最初的).  
What are key guidelines(方针) to follow for testers when working with defect reports(缺陷报告) in order to ensure bugs are correctly fixed the first time?
A. Generalize(概括) bugs - once steps are found to reproduce a bug, find out under what additional conditions the bug also occurs.  
B. Identify root causes(鉴定根本原因) - once steps are found to reproduce a bug, pinpoint why an issue is occurring by detailed investigation and by stepping through code.  
C. Enhance software(提高软件) - once bugs are identified suggest enhancements to improve the software and the likelihood of a first time fix.  
D. Isolate bugs(独立) - once steps are found to reproduce(复制) a bug, find out under what conditions the bug does not occur(不发生).  
E. Detail steps (详细步骤)- once steps are identified that reproduce a bug, add numbers to steps, convert simple phrases to complete sentences, run spellcheck, and add steps so that any user new to the software could retest the issue once it is marked fixed.  
AE
Question 16: Which of the following are critical factors(关键因素) to consider when testing the scalability(可伸缩性) of
web sites to handle various numbers(处理各个数目) of users?
A. Single users- the fixed response time of a single user loading a web page.  
B. User abandonment(用户放弃)- a measure of users leaving a web site due to increased wait time for pages to load.  
C. Concurrent users(并发用户)- the number of users simultaneously loading web pages  
D. Idle time(空闲时间)- the time period when no web pages are being loaded.  
E. Downtime- the time when the server is unavailable to users.  
C

Question 17: Which of the following statements(声明) about the introduction of new builds into a test environment are true?
A. When a new build enters into testing, it is critical(危急) to know what lines of code(行代码) have changed,
including commented lines of code, uppercase and lowercase changes(大小写变动), and differences in blank spaces.  
B. When a new build enters into testing, it is critical to know what features of the software have changed and what features are the same.  
C. When a new build enters into testing, it is critical to know what bugs have been fixed and marked ready for retesting.  
D. When a new build enters into testing, it is critical to know what items are deemed ready for testing and what are not ready for testing.  
E. When a new build enters into testing, it is critical to know what bugs were found and fixed during unit testing.
BCE

这个是我的答案,请问对不对?
另外翻译是我查金山词霸的!!在线等 速度!
分享到:  QQ好友和群QQ好友和群 QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
收藏收藏
回复

使用道具 举报

本版积分规则

关闭

站长推荐上一条 /1 下一条

小黑屋|手机版|Archiver|51Testing软件测试网 ( 沪ICP备05003035号 关于我们

GMT+8, 2024-11-27 14:11 , Processed in 0.064349 second(s), 28 queries .

Powered by Discuz! X3.2

© 2001-2024 Comsenz Inc.

快速回复 返回顶部 返回列表