51Testing软件测试论坛

 找回密码
 (注-册)加入51Testing

QQ登录

只需一步,快速开始

微信登录,快人一步

查看: 5746|回复: 0
打印 上一主题 下一主题

第31贴【2004-6-16】:CMM 2级KPA的目标

[复制链接]

该用户从未签到

跳转到指定楼层
1#
发表于 2004-6-16 13:20:12 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
CMM 2级:可重复级
        Requirement Management
        需求管理
        Goal 1  System requiremnets allocated to software are controlled to establish a baseline for software engineering and management use.
        目标1:分配到软件部分的系统需求通过建立基线受控。
        Goal 2   Software plans, products, and activities are kept consistent with the system requirements allocated to software.
        目标2:软件计划、产品和活动与分配到软件部分的系统需求一致。
       
        Software Project Planning
        软件项目计划
        Goal 1   Software estimates are documented for use in planning and tracking the software project.
        目标1:用来计划和跟踪软件项目的软件估计文档化。
        Goal 2   Software project activities and commitments are planned and documented.
        目标2:制定了软件项目活动和任务书的计划,并且有文档记录。
        Goal 3   Affected groups and individuals agree to their commitments related to the software project.
        目标3:受影响的小组和个人接受和软件项目相关的任务书。

        Software Project Tracking and Oversight
        软件项目跟踪及监控
        Goal 1  Actual results and performances are tracked against the software plans.
        目标1:按照软件计划跟踪实际结果和性能。
        Goal 2  Corrective actions are taken and managed to closure when actual results and performance deviate significantly from the software plans.
        目标2:当实际的结果和性能严重偏离软件计划时,采取了正确的行动终止这种状况。
        Goal 3  Changes to sofware commitments are agreed to by the affected groups and individuals.
        目标3:受影响的小组和个人接受软件任务书的变化。

        Software Subcontract Management
        软件子合同管理
        Goal 1  The prime contractor selects qualified software subcontractors.
        目标1:主签约人挑选有资格的子签约人。
        Goal 2  The prime contractor and the software subcontractor agree to their commitments to each other.
        目标2:主签约人和子签约人互相接受他们的任务书。
        Goal 3  The prime contractor and the software subcontractor maintain ongoing communications.
        目标3:主签约人和子签约人保持持续的沟通。
        Goal 4  The prime contractor tracks the software subcontractor's actual results and performance against its commitments.
        目标4:主签约人按照任务书跟踪子签约人的实际结果和效能。

        Software Quality Assurance
        软件质量保证
        Goal 1  Software quality assurance activities are planned.
        目标1:制定了软件质量保证计划。
        Goal 2  Adherence of software products and activities to the applicable standards, procedures, and requirements is verified objectively.
        目标2:客观地检验软件产品和活动是否符合适用的标准、过程和需求。
        Goal 3  Affected groups and individuals are informed of software quality assurance activities and results.
        目标3:软件质量保证的活动和结果通知了受影响的小组和个人。
        Goal 4  Noncompliance issues that cannot be resolved within the software project are addressed by senior management.
        目标4:高层管理着手解决在软件项目内部不能解决的不符合项。

        Software Configuration Management
        软件配置管理
        Goal 1  Software configuration management activities are planned.
        目标1:制定了软件配置管理活动的计划。
        Goal 2  Selected software work products are identified, controlled, and available.
        目标2:选定的软件工作产品是被标识的、受控的和可利用的。
        Goal 3  Changes to identified software work products are controlled.
        目标3:被标识的软件工作产品的变化是受控的。
        Goal 4  Affected groups and individuals are informed of the status and content of software baselines.
        目标4:软件基线的状态和内容通知受影响的小组和个人。
分享到:  QQ好友和群QQ好友和群 QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
收藏收藏

本版积分规则

关闭

站长推荐上一条 /1 下一条

小黑屋|手机版|Archiver|51Testing软件测试网 ( 沪ICP备05003035号 关于我们

GMT+8, 2024-5-7 12:56 , Processed in 0.065525 second(s), 25 queries .

Powered by Discuz! X3.2

© 2001-2024 Comsenz Inc.

快速回复 返回顶部 返回列表