51Testing软件测试论坛

 找回密码
 (注-册)加入51Testing

QQ登录

只需一步,快速开始

微信登录,快人一步

手机号码,快捷登录

查看: 2412|回复: 1
打印 上一主题 下一主题

[讨论] What is diffrence between iterative model and waterfall model?

[复制链接]

该用户从未签到

跳转到指定楼层
1#
发表于 2008-11-8 00:48:45 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
WaterFall Model: This is a flow based model, in which u
pass every phase once, and can not go back to that phase
again. That is why, it is used rarely now a days.

Drawback: If there is nay change in requirements, then u
can not make any chnages in  requirements.

Iterative Model: In this u can come back to previous
phases, and make the changes accordingly. In this we
revieved a final output product at the end of the SDLC.

Prototype Model: Here, we recieved Prototypes of the
product, before the final release. We relaese 4-5 Protypes
with some diffrences b/w them, and take client opinion, and
modifies the final Product, as per client suggestions.

Waterfall model: It includes all phases of SDLC.The
drawback is once the requirements request made
freezed,changes can't be done during any phase.

Iterative model: We can change requiremnts at any phase,
but the problem is all the phases of SDLC can take place
again.

Prototype model: We can change requirements before design
and coding can proceed.In this model, prototype is
developed based on the currently known
requirements.Development of prototype undergoes design,
coding, testing, which give client an actual feel of the
system. Prototype is a model which looks exactly like SDLC

望高手继续补充
分享到:  QQ好友和群QQ好友和群 QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
收藏收藏
回复

使用道具 举报

该用户从未签到

2#
发表于 2008-11-8 14:50:28 | 只看该作者
跌代就是多个瀑布.
回复 支持 反对

使用道具 举报

本版积分规则

关闭

站长推荐上一条 /1 下一条

小黑屋|手机版|Archiver|51Testing软件测试网 ( 沪ICP备05003035号 关于我们

GMT+8, 2024-11-24 12:06 , Processed in 0.072181 second(s), 28 queries .

Powered by Discuz! X3.2

© 2001-2024 Comsenz Inc.

快速回复 返回顶部 返回列表