Native place: GuangDong-China Locus now: GuangZhou
Training
30-04-2007 to 27-09-2007 51Testing Software testing engineer
Vocational Skills
1. Understand software quality model ISO9126, CMM.
2. Acquaint white box testing grizzle box testing black box testing
3. Acquaint with the function testing performance testing configuration testing compatibility testing GUI testing and Security testing in which B/S or C/S
4. Acquaint with the design method of test case and writing criterion of UT, IT, ST.
5. Master the writing method of SVVP, testing scheme, testing report.
6. Acquaint the method and process of the require management, defect management, configure management, and peer review.
7. Acquaint with in common use test the tool Cppunit, TCL, QTP, LoadRunner, robot and configure management tool CVS and testing management tools the TD/QC.
8. Acquaint the development language C/C++ C# and database SQL server
9. Acquaint use Httpwatch Appscan and OmniPeek TOOL assistant testing.
10. Acquaint with windows series system, have certain understanding to the Linux.
project experience
Project Time:2007.07—2007.08
Project Name:Counter 1.0
Summarize:CounterV1.0 is software by C++ developing, which can count the number of code line, empty line, comment line and the total line of the .c/ .cpp file.
1. Participate in a review of SRS, HLD and LLD document and have a discussion with the other people in group and expressed my own opinion;
2. Write system testing plan and testing requirement according to the SRS document;
3. Have the methods of equivalence class, boundary value to design system test case and do the function testing, performance testing and GUI testing;
4. According to the HLD design integration test case by the method of Big Bang Integration. Set up the condition of automated testing by TCL language and write testing scripts;
5. According to the LLD design unit test case by the method of statement coverage, branch coverage and path coverage, etc. Use the CppUnit to set up the condition of the unit testing and check the branch coverage rate by Bullseye Coverage tool;
6. Execute all the test cases and write the testing daily report and bug report. Finish the testing report and give a summary of the counter testing.
Harvest:
A. Know the responsibilities in each testing stage by this project practice;
B. Familiar with design and writing the test case;
C. Have a good command of TCL language and familiar with setting up the condition of integration testing and Skill in using the CppUnit;
D. Familiar with writing testing documents, such as testing scheme and testing plan
Education
09-05 to 07-07 Neusoft info technique college software technique