Testing Project practice:
Sep.2006—Nov.2006 Counter V1.0
Counter V1.0 is a C source document code competent to count tool. It is a unit procedure under Windows system. Can follow choice of user count total code competent count, null of source document separately, explanatory note competent to it count and not non- empties to be explanatory note competent to count.
Personal working content:
-Finish the demand specification manual of counter project, evaluation of outline design instruction, detailed design instruction.
-The unit tests, integrates testing, system testing and testing relevantly that plan, test the writing of the scheme.
-Test is tested using writing, utilizing TCL language to integrate of the example, utilize CppUnit to carry on the unit to test.
-Submit the defective report, test report, test the daily.
Professional skills:
Software testing:
1、acquainted with each stage of the software life cycle, controlledled the waterfalls model in the development of software, understand the spiral model,the RUP process and IPD process.
2、have thorough understanding to the software quality, acquaint with the CMM quality model.
3、controlledled the black box and white box testing method.
4、acquaint with the software testing process and the stage of it, controlledled each testing stage that have to in testing activity.
5、controlled the purpose of the unit testinging and the keypoint that have to pay attention to in unit testinging, the development of driving and stake, and the unit testinging strategy!
6、controlled the purpose of the integration testinging and the keypoint that have to pay attention to in integration testinging, and the integration testinging strategy!
7、controlled the object of the system testing and the test of the familiar testing type.
8、controlled the meaning and its calculation of various logic coverage rate.
9、have deep understanding to the thought of testing management, acquaint with the process of the judgement of craft brother.
10、understanding the conception of the configuration management, controlleded each activity of the configuration management, can use the configuration tool such as CVS,VSS etc. to carry on the simple configuration management.
11、understanding the importance of the track of the requirement, can use the related tool to execute the track of the requirement.
12、controlleded the basic process of the track of Bug, can fill in the Bug report list.
13、controlled the writing point of the requirement specification manual, can participate in the judgement of requirement.
14、controlled the writing point of various testing text file(include system,integration,the unit testing plan and project), can write the primary text file.
15、can use various of method (including equipollence species,the boundary value,cause and effect diagram,procedure flow chart,state transfer diagram etc.) to designed the system testing case.
16、can carry on the system testing, and the record in the testing performance process, writing the testing the newspaper and blemish report, controlled the writing point of the system testing report.
17、understanding the writing and the keypoint of the judgement of the essentials design manual, can according to the certain way of thinking and method design the integration testing case.
18、can use the TCL script language to carry on the integrated testing automatly.
19、understanding the writing and the keypoint of the judgement of the particular design manual, can according to the certain way of thinking and method design the unit testing case.
20、 can use the TCL script language and the CPPUnit automation frame to carry on the unit testing automatly, and use the purify tool to acquire a testing coverage rate.
21、can use the tool such QTP to carry on the function testing automatly,and the tool such as Robot and LoadRunner carry on performance testing automatly.
22、familiar with the testing management tool:QC,can use QC to execute testing management.
development language:
be familiar with the basic grammar of C and can complete the simple edition about C.
know the basic grammar about Visual Basic.
database:
master the basic operation of SQL-Server
About English Ability:
Certificate Of University English for Grade 4.Be able to use English fluently.
The work career:
2006.7-2006.11 HangYue electronic limited company of Changzhou (Quality Assurance)
2005.10-2006.3 Shanghai Youxun limited company.(Sales assistant)
Education & Training:
2005.11-now 51Testing Software testing engineer training in Shanghai Jiaotong University
2001.9 -2005.7 XuZhou Normal University