标题: Test Plan Template(英文版) [打印本页] 作者: louis_lu 时间: 2007-1-2 16:29 标题: Test Plan Template(英文版) 最近部门在搞SW Process的规范,其中我们的测试占了很重要的一个比例,这是我所开心看到的。
我们着重要在test plan,test cases, release report, bug report方面做出一些具有指导性的文档来。
所以我现在急需一份english版的test plan作为指导。
请各位朋友帮忙,谢谢了!作者: AlexanderIII 时间: 2007-1-2 16:58
google一下吧作者: eightants 时间: 2007-1-3 23:53
Please see the following attachment.
[ 本帖最后由 eightants 于 2007-1-3 23:58 编辑 ]作者: louis_lu 时间: 2007-1-4 11:35 标题: 回复 #3 eightants 的帖子 You did a great help to me!
Thanks a lot!作者: enjoytest 时间: 2007-1-8 11:12
thanks a lot for uploading the template作者: boluobing 时间: 2007-7-9 22:54 标题: test plan Test Plan
Template
Version 1.0 ● 24 MAY 2006
Using This Template
The companion document, Test Plan Instructions, provides detailed direction for completing this template. This and other Framework documents, including a glossary, are available at www.dir.state.tx.us/pubs/framework/.
To create a document from this template:
1. Delete the template title page (previous page) and this page.
2. Replace [bracketed text] on the cover page (next page) with your project and agency information.
3. Replace [bracketed text] in the document header area at the top of page i (Contents page) with the same project and agency information as on the cover page.
Note: Please do not remove or modify content in the footer area.
4. Complete the entire template. Each section contains abbreviated instructions and a content area. The content area is marked with a placeholder symbol () or with a table. Relevant text from other project documents may be pasted into content areas.
5. Update the table of contents by right-clicking and selecting “Update Field,” then “Update Page Numbers Only.”
Contents
Section 1. Overview 1
Section 2. Test Methodology 2
2.1 Elements of Testing 2
2.2 Types of Testing 2
2.3 Phases of Testing 3
Section 3. Test Schedule 4
Section 4. Test Monitoring and Reporting 5
4.1 Monitoring 5
4.2 Reporting 5
Section 5. References 6
Section 6. Glossary 7
Section 7. Revision History 8
Section 8. Appendices 9
Section 1. Overview
Describe the high-level approach to testing for the project. Describe the test objectives, test scope, and approach to testing adopted by the project team.
Section 2. Test Methodology
2.1 Elements of Testing
Describe the elements of testing for the project.
2.2 Types of Testing
2.2.1 Functional Testing
Describe the functional testing for the project.
2.2.2 Data Testing
Describe the data testing for the project.
2.2.3 User Testing
Describe the user testing for the project.
2.2.4 Non-functional (Systems Requirements) Testing
2.2.4.1 Performance Testing
Describe the performance testing for the project.
2.2.4.2 Quality Testing
Describe the quality testing for the project.
2.2.4.3 Interface Testing
Describe the interface testing for the project.
2.2.4.4 Other Testing
Describe the other testing for the project that is not covered in the types of tests described in previous sections.
2.3 Phases of Testing
Customize and complete the Test Phase Chart to reflect the test phases and approach for the project.
Test Phase Chart
Test Phases Unit Integration System Acceptance X Phase
Objective
Focus
Test Types/
Subtypes
Staffing
Environ¬ment
Entry Criteria …
Suspen¬sion Criteria
Exit Criteria
Section 3. Test Schedule
Provide a reference to the location of the project test schedule information or specify the project test schedule information. Include resources, prerequisites, and start/completion dates for each activity, deliverable, and milestone.
Section 4. Test Monitoring and Reporting
4.1 Monitoring
Describe monitoring activities and milestones that will be used to evaluate actual progress to plan.
4.2 Reporting
Describe the reports that will be used to document the execution and results of each test phase.
Section 5. References
Identify the information sources referenced and utilized in developing the Test Plan.
Document No. Document Title Date Author
Section 6. Glossary
Define all terms and acronyms required to interpret the Test Plan properly.
Section 7. Revision History
Identify document changes.
Version Date Name Description
Section 8. Appendices
Include any relevant appendices.作者: boluobing 时间: 2007-7-17 00:44 标题: tr1 Text file name: { The 〈 TestLink 〉 system test report}
Item name: {TestLink}
Use the unit:{ Use the unit name}
Design the unit: The numerical technique of the sea beginning of a reign develops limited Mr. in Peking
The item serial number item name item the manager develops the representative director to test the representative director to test the engineer
{ Fill in}
Change the record
The edition number that changes the date changes the contents to change the person
{ Fill in}
The eyes record
Chapter 1 leads the speech - 2 -
1.1 purposes - 2 -
1.2 backgrounds - 2 -
1.3 The edition definition rule - 2 -
1.4 references - 2 -
1.5 test essentialses - 3 -
1.5.1 test essentials introduction - 3 -
1.5.2 the tests participate the person's concrete arrangement - 5 -
A test result and detection - 6 -
2.1 unit tests with gather test - 6 -
2.2 interface tests - 6 -
2.3 function tests - 7 -
2.3.1 function test outlines - 7 -
2.3.2 function test conclusions - 7 -
2.4 business tests - 7 -
2.5 top the line test - 8 -
An analytical conclusion - 8 -
3.1 abilities - 8 -
3.2 blemishs and restricts - 8 -
3.3 test result - 9 -
3.3.2 stage products release the quantity elucidation - 9 -
3.3.3 quantity analysis and adjust the measure - 9 -
3.3.3.1 other problem elucidations - 9 -
3.3.3.2 influence analysis - 9 -
3.4 conclusions - 10 -
A human resource install 0
Chapter 1 leads the speech
1.1 purposes
{ This text file is carries on various comprehensive test to the 〈 TestLink 〉 item terrace behind of the total analysis report.At
After carrying on the test to the whole system, as a result carry on the analysis to various test, whether the analysis system meet the demands the rules or not
Request of settle.This report carried on the description towards synthesizing the test and returning to return the test as a result, the scope overlaid all 功s
Ability item and the business need, establishment the procedure can press to expect of conceive the confidence of the movement, also rise to provide for the customer
Apply and check before acceptance the function of reference.}
1.2 backgrounds
{ Want to be in accordance with the item need specification the elucidation with the related text file}
1.3 The edition definition rule
The edition rule elucidation remarks
{ Fill in}
1.4 references
{ The need, the DEMO design of the item that the text file to consult etc. text file}
{ The report of the test that the text file to hand over, use an etc. text file}
1.5 test essentialses
{ The analytical report of this test is a foundation that plans the peaceful set test problem report in the 〈 test of the TestLink 〉
Write up of.The whole test process of the 〈 TestLink 〉 is according to 《 ( TestLink) the test plan 》 of hour
The and human resources install something to carry on.This test the plan tests the person to the each stage, test time and must lift
The text file of hand over carried on the detailed plan, rising the direct and directive functions of time to the whole test process.
Carried on the unit test and gather according to the plan test, page test, function and business test, top line test,
The concrete test problem pay respects to 《 ( TestLink) the test problem report 》 , this form that reports the form recorded
The 〈 TestLink 〉 terrace is in test engineering the problem discover, and recorded to correspond the problem to test the person and measure
Try time and return to circumstance of return the test, until the problem close.}
1.5.1 test essentials introduction
{ In the whole item implement process, the test work according to 《 ( TestLink) the test plan 》 define
The stage carries on the test of, ising divided into the unit and gathering test, interface test, function test, business test and top line
Test.Underneath to this severals introduction that tests the process of the part to be the synopsis respectively.}
{ Test the environment with actual the difference that the environment may exist:
1, actual customer operate system in may have various advertisement to intercept the software, this will result in at use should department
In the process of 统 , flick the page open and will be shield, use the door and can't operate the system some set up the function of the window way lately.
2, be the customer usage IE browser low in 6.0 editions, the page style will appear the wrong and can't show
The page result etc. problem.}
{ Unit and gather test:The main purpose of the unit test is to obtain the applied procedure in can test the software most
The crumb segment, insulate with the rest part of the code it to open, then make sure its behavior whether with expectation of similar.
After testing each unit respectively gather they go to the mold piece with the test of the mold piece connects.Develop the personnel at
Develop and pass the unit test and can expel the code blemish of the big part in the process.
Gather the test is the unit test of logic expand.Main test form is:Two unit that have already tested
Constitute a module, and test they connect.In realistic project, many units constitute the set
Piece, but these modules come together again larger part of the procedure.The method is a combination that tests the part, and end expand
Progress, test the mold's piece with the mold piece of other sets together.End, will constitute all molds piece of progress to measure together
Try.In addition, if the procedure is constitute by several progress, becoming to test all progress towards testing them, not at the same time.
Gather the test can identify to combine the unit the problem for appear.Pass to gather test the circumstance quantity that the ability will arise problem
Reduce more in brief analytical Class.}作者: boluobing 时间: 2007-7-17 00:44 标题: tr2 { Interface test:The interface test mainly according to the related need text file, set out from the angle of the customer according to use
An interface JIAN3 JIE2, navigate definitely, the easy operation waits a few principles, taking need text file, DEMO as the basis to carry on the test.
The test mainly covers the 〈 TestLink 〉 terrace in each page of the mold a 〉 of the 〈 system.Give grind in test process
Deliver the department puts forward a lot of suggestions and problem, and carried on back to return the test towards change behind problem and the suggestion for adopt.}
In test process the main attention that page test/ the check order as follows:
Check the item category that tests the personnel and it evaluate
The window way cut over, move, change the hour of size normal?
{ Fill in}
Is various writing of interface chemical element right?( Such as the headline, hint etc.)
{ Fill in}
Is various appearance of interface chemical element right?( Such as valid, invalid, pick out
Wait the appearance)
{ Fill in}
Various interface chemical element support keyboard operation?
{ Fill in}
Various interface chemical element support mouse operation?
{ Fill in}
In the dialog box of lack the province focus right?
{ Fill in}
Does an ability of data exactitude return to show?
{ Fill in}
For the in common use function, customer can need not read can the manual use?
{ Fill in}
The performance contain the operation of the risk, having the "ing confirm"," give up"...etc. to hint?
{ Fill in}
Is the operation order reasonable?
{ Fill in}
Do you have the 联 machine help?
{ Fill in}
Is various layout of interface chemical element reasonable?Beauty?
{ Fill in}
Does various color of interface chemical element moderate?
{ Fill in}
Various shape beauty of interface chemical element?
{ Fill in}
The form of written beauty?
{ Fill in}
Does the diagram mark keep the view?
{ Fill in}
{ Function test:For the sake of the request of convenience and the business work that customer use, in the 〉 platform of 〈 TestLink
Definition the function mold piece, carried on the function test according to the need to each function mold pieces, and chase to test the process in
Problem and some improvements opinion feedbacks of the detection give correspond of develop the personnel to carry on the modification.Combine to change behind problem and adopt
The suggestion of the 纳 carries on back to return the test.}
{ Business test:The 〈 system business process description 〉 give with the form feedback of" BUG" the place that have problems
Correspond of develop the personnel to carry on the modification, the modification is behind return to test the personnel to carry on back to return the test, keep go to satisfy each 委
Do the business request that bureau correspond.}
{ Last line test:For insuring the system and canning circulate normally behind up the line, on the system the line is behind according to plan in advance
Carry on take out to measure to the business of the system.The scope that ascends the line test includes all functions of the 〈 TestLink 〉 terrace, and
The business that samples the 〈 to correspond flow or the business items 〉 make the business test, having the test item that the selection take out to measure extensively of
Represent sex.Combine to test in the problem discover hand over to be responsible for the engineer of the line of the system carries on revising in time,
Combine to carry on back to return the test to the problem change behind.}
1.5.2 the tests participate the person's concrete arrangement
The ordinal number test type Participate the person
1 The unit test with gather test{ fill in}
2 The interface test
3 The function test
4 The business test
5 Last the line test
A test result and detection
2.1 unit tests with gather test
{ The main purpose of the unit test is obtain the applied procedure in can test the software of the minimum unit mold piece, will it
Insulate with the rest part of the code to open, then make sure its behavior whether with expectation of similar.Each development personnel
Carry on after each unit complete to request to carry out the unit test according to the test norm, guarantee each unit nonentity
Problem, item manager each period meeting folio delivers the personnel's development result implement to make selective check, and check the solid unit test of
Usefulness.
In distinguish testing each unit mold piece after open personnel will they gather become arrive a mold piece with gather test
Of form carry on the examination, adoption from measure and cross the method of the test, some molds piece test the personnel to also get involved to carry on measure
Try, the item manager's the test point concern to the mold piece and check, keep go to the whole business function all passes the test, just
Hand over to carry on the system test.
Pass the unit test in accordance with gather the test, the item every variety of the havings totally the methodical logic and the design;Account
The test of row is already all to carry out;It have problems to was all record in the test;The problem discover has already resolved all;All
The problem of resolves all have already carried on back to return the test to combine to pass finally.}作者: boluobing 时间: 2007-7-17 00:45 标题: tr3 2.2 interface tests
{ According to 《 ( TestLink) the system test plan 》 , 《 ( TestLink) the system test uses the example 》 ,
《 ( TestLink) the DEMO design 》 carried on the page test to that system with the related need text file.Be in the light of the boundary at the same time
Face JIAN3 JIE2, navigate definitely, this a few principles of easy operation carries on the test for the basis.
Follow the tool Butterfly to carry on follow towards test in the problem discover and the suggestion for put forward through a blemish,
Combine the problem to succeed in catching to carried on back to return the test, pay respects to in a specific way 《 ( TestLink) the test problem report 》 .Attain
The need text file in the request of request and basic interface test describe, can carry on the business test and function tests
Stage.}
2.3 function tests
2.3.1 function test outlines
1. <TestLink>
The ordinal number test contents remarks
1{ fill in}{ fill in}
2
3
4
2.3.2 function test conclusions
{ According to 《 ( TestLink) the system test plan 》 , 《 ( TestLink) the system test uses the example 》 ,
《 ( TestLink) the need specification manual 》 carried on the function test to that system with the related need text file, all
The function is normal, among them including to navigate, the data functions such as importation, processing and index etc..Get while use valid data
Arrive the anticipant result;Show the homologous mistake news or the warning newses while use invalid data;The business rules are all
Got the right application.All normal importation data, all schools of invalid data check the exactitude, and hint
The language is fitting, all data importation, processing and inspect all right without any error.To test in the problem discover and lift
The suggestion of follows the tool Butterfly to carry on follow through a blemish, and carried on back to return to measure to the problem after change
Try, close all problems, pay respects to in a specific way 《 ( TestLink) the test problem report 》 .Come to a the need text
The result of the request and the function test describe in the file.}
2.4 business tests
{ According to 《 ( TestLink) the system test plan 》 , 《 ( TestLink) the system test uses the example 》 , 《 ( TestLink)
The need specification manual 》 carried on the business test to that system with the related need text file, the 〈 system business process copy
Say the 〉 .Problem and the modification circumstances that test the detection can pay respects to 《 ( TestLink) the test problem report 》 , this report with
The form of the form recorded the 〈 TestLink 〉 terrace problem and the test results discover in the test.
Follow the tool Butterfly to carry on follow towards test in the problem discover and the suggestion for put forward through a blemish,
Combine to carried on back to return the test to that problem, close all problems, pay respects to in a specific way 《 ( TestLink) the test ask
A report 》 .Come to a the need text file in the result of the request and the business test describe.}
2.5 top the line test
{ For insuring the system and canning circulate normally behind up the line, on the system the line is behind according to plan in advance to the industry of the system
The 务 carries on take out to measure.The scope that ascends the line test include 《 ( TestLink) the test problem report 》 all function of the terrace,
Sample the business that 〈 correspond to flow also or the business items 〉 make the business test, the items that take out to measure the selection have extensively of
Represent sex, can overlay the function of the system terrace.Combine to test in the problem discover hand over to be responsible for system last line
Of engineer carried on to revise in time, carried on back to return the test to the problem in modification, insure have problems all already
The close just can deliver to notify up the line, notify all participate the personnel up the line success.
The environment that this time test use all according to true environment, pass to measure to the terrace function and parts of business
Try, all realizations with all function of the 〈 TestLink 〉 , the function of the system also can satisfy the business need completely.Most
Test all requests that take out to measure the processes to all meet the demands the specification manual of the result enunciation eventually, can consign the usage.}
An analytical conclusion
{ It cover the 〈 system business JIAN3 SHU4 〉's function scope in this system test process, according to the business and actual
Function the organization carried on overall, system, valid test, as a result give according to the test test analysis conclusion:}作者: boluobing 时间: 2007-7-17 00:45 标题: tr4 3.1 abilities
{ At carried on the unit test and gather to the 〈 TestLink 〉 test, interface test, function test, business
Each kind of test of all levelses such as test and the top line test etc. and pass the blemish to follow the tool to carry on the whole distance to follow close after, verify
The system carried out various function and designs that customer request completely, and put forward the system to create on this foundation
A little bit new, had to pass the ability that the network system completes the customer business.}
3.2 blemishs and restricts
{ The item set analyzed each stage test hard in the existent BUG, reason and key sticking points that seek the wrong emergence order,
Carried on to each kind of problem in time of close, and the modification that return to return the test and draw inference from one example to each kind of blemish implement,
Guaranteed all problems all with close, satisfied the whole function request of system.}
3.3 test result
3.3.1 test activity summary
Test beginning time
Test be over time
Test the address Stage:
Backstage:
Test the workload elucidation Stage The mission elucidation starts time End time
Plan physically Plan Actual
The system test system test
3.3.2 stage products release the quantity elucidation
The blemish infusion total amount() The blemish discovers the number The blemish modifies the number Isn't a problem/ nonsupport The blemish remains the remainder Blemish clearance rate
5 classes
4 classes
3 classes
2 classes
One class
Suggest
Total
3.3.3 quantity analysis and adjust the measure
3.3.3.1 other problem elucidations
[ Still carry on the elucidation to the problem exist currently]
3.3.3.2 influence analysis
[ Explain the influence of problem]
3.4 conclusions
{ After carrying on various function, function, the business 评's measure to the 〈 TestLink 〉 system, think that that system can
Satisfy the customer request, come to a the reserved target.
Various index signs of that software can meet the demands the request of the specification manual, can consign the usage.}
A human resource install
Human resource
Role The minimal resources( the full-time role quantity assign) concrete job or exegesises recommend
The director general of the technique{ fill in} Carry on the management direct
Provide the technique guidance
Appropriate resources guarantee
Provide the management report
Test the representative director
{ Fill in}
Understand the need establishment test plan and use the example
Establishment test the tool and blemishs follow tool
Supervise and control to test the total degree of progress
Aim at to test the item establishment test report and conclusions
Test the engineer
{ Fill in}
The plan of press the test carries out each stage test
Use the problem follows the tool feedback test problem
Record result
The execution returns to return the test, the close BUG
Valuation test the usefulness of the work
Install the managing person
{ Fill in}
Insure to test the environment and the test datas( database)
The environment gets the management and maintenances.
Manage to test the system
Allotment and management role to test the interview power of the system
The text in the item file management作者: boluobing 时间: 2007-7-17 00:47 标题: TRC1 http://www.cnblogs.com/hustlxjaw/archive/2007/01/26/630926.aspx
文档编号:
版 本 号:
密 级:内部绝密
}作者: boluobing 时间: 2007-7-26 17:13 标题: Good using System;
using System.IO;
using System.Collections;
namespace FileReader_csharp
{
///
/// Summary description for Class1.
///
class Homework
{
原帖由 eightants 于 2007-1-3 23:53 发表
Please see the following attachment.
Thanks for your upload. and I need test plan now, but I don't known how to write with english.作者: superload 时间: 2008-2-5 14:09
Thanks for your upload作者: zh4ang 时间: 2008-2-24 10:56
好长啊作者: zh4ang 时间: 2008-2-24 10:57
。。。作者: zh4ang 时间: 2008-2-24 10:59
。。作者: aancting 时间: 2008-4-23 10:44
thanks作者: lansechuiyan 时间: 2008-4-24 13:55
太牛掰了!作者: baolai588 时间: 2008-5-4 15:35
Thanks.作者: 蓝雪 时间: 2009-6-4 18:09
不错,不错!!very good作者: jingchu 时间: 2009-6-5 09:29 标题: 3Q 3Q作者: anna_0176 时间: 2009-11-12 18:32
非常感谢
hoho很好作者: myrokey 时间: 2010-3-19 09:03 标题: thanks very much !