Instructions                       
This sample test case log can be used as a template for creating your own log. Save this sample under your own workbook name. Then review the tests on each worksheet tab to determine if they apply to your implementation. Delete tests which do  not apply, and add new tests which do fit your environment.                       

How to use this Test Case Log                       
"This workbook contains seven worksheets for the actual testing: one for basic environmental tests of your Microsoft Office Project Server 2003 computer system, five that cover typical tests by different user types, and one that covers integrated tests where the tester takes on several roles during the test process. A very basic bug list worksheet is also provided to record test results and resolution in this workbook if desired.

Begin with the environmental tests. They must be conducted first. Next, several testers may conduct tests simultaneously, each assuming a different role (project manager, resource manager, team member, executive, and administrator). When all of these tests have been conducted, and all bugs addressed, then conduct the integrated role tests. In these tests, a user will need to logon as several different users. In most cases, this will require setting up Project Server 2003 authenticated accounts, but ideally this should be performed using Windows User Authentication in a test environment where one user has access to the network credentials of multiple test Windows user accounts."                       
"When completing the worksheets the following data is captured:

Test: A brief description of the test
Document Reference: if there is a specific reference document which describes the test, enter that reference here.
Date Completed:  
Tester: The initials of the tester. Note that by listing the tester's initials to the right on this instruction worksheet, a drop-down list will appear when the sheet is being completed.
Pass/Fail: Self-explanatory. The valid entries are shown to the right, and may be modified if you wish. When a test fails, the recommended practice is to insert a ""retest"" row immediately below the failure and document the retest on that row.
Bug Reference: Enter the bug ID. The bug list worksheet can also be used as a means of resolving the bugs. The ""bugs assigned to"" list to the right can be used with the bug list worksheet.
Resolution/Comments: The tester should enter any clarifying information here.

Each tester should complete the summary at the top of the worksheet after each test period is complete. Enter the total number of tests conducted to date,  passed to date, and failed to date in column B.
"                Enter the initials of your test team below        Enter the list of groups or individuals who will be assigned bug resolution responsibilities below
        Pass/Fail:        Testers:        Bugs assigned to:
        Pass        REM        System Admin
        Fail        MH        IT Support
        More Info        NC        Development
        other categories here        WO        others responsible here
                other testers here

yuqingannie 2007-9-4 15:50

do you use management tools

like  Mercury Quality Centersdlkfj4

lenovo1217 2007-9-6 11:28

感谢共享23

感谢共享23

changlang530 2007-9-7 09:57

不错,谢谢提供。

ellse 2007-9-19 18:32

怎么下不了呢?奇怪

ellse 2007-9-19 18:32

为啥我的综合指数又下降了阿?奇怪

kinkikids 2007-9-21 17:29

nice

dabeixiong 2007-9-21 23:52

微软的东西算啥啊~软件做的垃圾~测试工作连大妈都能做~微软的员工人品也有问题啊~动不动就说啥给微软几百万做个啥软件的。。。nb烘烘个啥啊~

zhouzxcv 2007-9-24 23:21

昏,太简单了

peakqi 2007-10-4 11:30

yun

peakqi 2007-10-4 11:30

hanyan

tongfei96 2007-10-4 13:33

谢谢

谢谢

乖乖好乖 2007-10-4 14:16

看看先..谢谢啦

sunlaomi 2007-10-5 01:57

谢谢~

brianq 2007-10-5 22:34

挺好的,做参考收藏。

lengqing 2007-10-8 15:11

看看先

JOBSDB_joyce 2008-12-8 12:31

^^ 看看先
页: [1]
查看完整版本: 来自微软的testcase log